The operational efficiency of the LHC is analyzed by looking at the downtime statistics over the 2010 run. Hardware reliability is reviewed along with the mitigation actions put in place for the 2011 run. Recovery, duration and frequency of scheduled technical stops are also discussed. Finally, poss...