The operational overheads of moving above 3.5 TeV are examined. The costs of performing such a move at the start, or during, the 2011 run are evaluated. The impact of operation with beams above 3.5 TeV on machine protection systems is briefly reviewed, and any potential limitations are enumerated. F...