Operational overhead of moving to higher energies
The operational overheads of moving above 3.5 TeV are examined. The costs of performing such a move at the start, or during, the 2011 run are evaluated. The impact of operation with beams above 3.5 TeV on machine protection systems is briefly reviewed, and any potential limitations are enumerated. F...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2011-005.173 http://cds.cern.ch/record/1353853 |
Sumario: | The operational overheads of moving above 3.5 TeV are examined. The costs of performing such a move at the start, or during, the 2011 run are evaluated. The impact of operation with beams above 3.5 TeV on machine protection systems is briefly reviewed, and any potential limitations are enumerated. Finally the possible benefits of increasing the beam energy on the luminosity are discussed. |
---|