Cargando…

Operational overhead of moving to higher energies

The operational overheads of moving above 3.5 TeV are examined. The costs of performing such a move at the start, or during, the 2011 run are evaluated. The impact of operation with beams above 3.5 TeV on machine protection systems is briefly reviewed, and any potential limitations are enumerated. F...

Descripción completa

Detalles Bibliográficos
Autor principal: Lamont, M
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2011-005.173
http://cds.cern.ch/record/1353853

Ejemplares similares