HiRadMat Low Intensity Beam Commissioning
On Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam...