Cargando…

HiRadMat Low Intensity Beam Commissioning

On Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam...

Descripción completa

Detalles Bibliográficos
Autores principales: Blanco Sancho, J, Conan, N, Cornelis, K, Goddard, B, Hessler, C, Jensen, L, Kain, V, Meddahi, M, Theis, C, Vojtyla, P, Wenninger, J
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1367514
_version_ 1780922779821932544
author Blanco Sancho, J
Conan, N
Cornelis, K
Goddard, B
Hessler, C
Jensen, L
Kain, V
Meddahi, M
Theis, C
Vojtyla, P
Wenninger, J
author_facet Blanco Sancho, J
Conan, N
Cornelis, K
Goddard, B
Hessler, C
Jensen, L
Kain, V
Meddahi, M
Theis, C
Vojtyla, P
Wenninger, J
author_sort Blanco Sancho, J
collection CERN
description On Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam line equipment and to verify the beam parameters. At the first trial, the proton beam reached the end of the primary beam line and the preliminary checks allowed confirming that all beam equipment and parameters are within the specification.
id cern-1367514
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-13675142019-09-30T06:29:59Zhttp://cds.cern.ch/record/1367514engBlanco Sancho, JConan, NCornelis, KGoddard, BHessler, CJensen, LKain, VMeddahi, MTheis, CVojtyla, PWenninger, JHiRadMat Low Intensity Beam CommissioningAccelerators and Storage RingsOn Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam line equipment and to verify the beam parameters. At the first trial, the proton beam reached the end of the primary beam line and the preliminary checks allowed confirming that all beam equipment and parameters are within the specification.CERN-ATS-Note-2011-055 PERFoai:cds.cern.ch:13675142011-07-14
spellingShingle Accelerators and Storage Rings
Blanco Sancho, J
Conan, N
Cornelis, K
Goddard, B
Hessler, C
Jensen, L
Kain, V
Meddahi, M
Theis, C
Vojtyla, P
Wenninger, J
HiRadMat Low Intensity Beam Commissioning
title HiRadMat Low Intensity Beam Commissioning
title_full HiRadMat Low Intensity Beam Commissioning
title_fullStr HiRadMat Low Intensity Beam Commissioning
title_full_unstemmed HiRadMat Low Intensity Beam Commissioning
title_short HiRadMat Low Intensity Beam Commissioning
title_sort hiradmat low intensity beam commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1367514
work_keys_str_mv AT blancosanchoj hiradmatlowintensitybeamcommissioning
AT conann hiradmatlowintensitybeamcommissioning
AT cornelisk hiradmatlowintensitybeamcommissioning
AT goddardb hiradmatlowintensitybeamcommissioning
AT hesslerc hiradmatlowintensitybeamcommissioning
AT jensenl hiradmatlowintensitybeamcommissioning
AT kainv hiradmatlowintensitybeamcommissioning
AT meddahim hiradmatlowintensitybeamcommissioning
AT theisc hiradmatlowintensitybeamcommissioning
AT vojtylap hiradmatlowintensitybeamcommissioning
AT wenningerj hiradmatlowintensitybeamcommissioning