HiRadMat Low Intensity Beam Commissioning
On Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1367514 |
_version_ | 1780922779821932544 |
---|---|
author | Blanco Sancho, J Conan, N Cornelis, K Goddard, B Hessler, C Jensen, L Kain, V Meddahi, M Theis, C Vojtyla, P Wenninger, J |
author_facet | Blanco Sancho, J Conan, N Cornelis, K Goddard, B Hessler, C Jensen, L Kain, V Meddahi, M Theis, C Vojtyla, P Wenninger, J |
author_sort | Blanco Sancho, J |
collection | CERN |
description | On Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam line equipment and to verify the beam parameters. At the first trial, the proton beam reached the end of the primary beam line and the preliminary checks allowed confirming that all beam equipment and parameters are within the specification. |
id | cern-1367514 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2011 |
record_format | invenio |
spelling | cern-13675142019-09-30T06:29:59Zhttp://cds.cern.ch/record/1367514engBlanco Sancho, JConan, NCornelis, KGoddard, BHessler, CJensen, LKain, VMeddahi, MTheis, CVojtyla, PWenninger, JHiRadMat Low Intensity Beam CommissioningAccelerators and Storage RingsOn Wednesday 22 June 2011, proton beam was sent for the first time through the HiRadMat primary beam line, onto the beam dump located in the HiRadMat experimental cavern. The aims of the beam commissioning were to check the beam line geometry and design validity, the correct functioning of all beam line equipment and to verify the beam parameters. At the first trial, the proton beam reached the end of the primary beam line and the preliminary checks allowed confirming that all beam equipment and parameters are within the specification.CERN-ATS-Note-2011-055 PERFoai:cds.cern.ch:13675142011-07-14 |
spellingShingle | Accelerators and Storage Rings Blanco Sancho, J Conan, N Cornelis, K Goddard, B Hessler, C Jensen, L Kain, V Meddahi, M Theis, C Vojtyla, P Wenninger, J HiRadMat Low Intensity Beam Commissioning |
title | HiRadMat Low Intensity Beam Commissioning |
title_full | HiRadMat Low Intensity Beam Commissioning |
title_fullStr | HiRadMat Low Intensity Beam Commissioning |
title_full_unstemmed | HiRadMat Low Intensity Beam Commissioning |
title_short | HiRadMat Low Intensity Beam Commissioning |
title_sort | hiradmat low intensity beam commissioning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1367514 |
work_keys_str_mv | AT blancosanchoj hiradmatlowintensitybeamcommissioning AT conann hiradmatlowintensitybeamcommissioning AT cornelisk hiradmatlowintensitybeamcommissioning AT goddardb hiradmatlowintensitybeamcommissioning AT hesslerc hiradmatlowintensitybeamcommissioning AT jensenl hiradmatlowintensitybeamcommissioning AT kainv hiradmatlowintensitybeamcommissioning AT meddahim hiradmatlowintensitybeamcommissioning AT theisc hiradmatlowintensitybeamcommissioning AT vojtylap hiradmatlowintensitybeamcommissioning AT wenningerj hiradmatlowintensitybeamcommissioning |