Cargando…

The LHC RF System - Experience with beam operation

The LHC RF system commissioning with beam and physics operation for 2010 and 2011 are presented. It became clear in early 2010 that RF noise was not a lifetime limiting factor: the crossing of the much feared 50 Hz line for the synchrotron frequency did not affect the beam. The broadband LHC RF nois...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Angoletta, M E, Argyropoulos, T, Arnaudon, L, Bohl, T, Brunner, O, Butterworth, A, Ciapala, E, Dubouchet, F, Esteban-Muller, J, Ferreira-Bento, J, Glenat, D, Hagmann, G, Hofle, W, Jacquet, D, Jaussi, M, Kouzue, S, Landre, D, Lollierou, J, Maesen, P, Martinez Yanez, P, Mastoridis, T, Molendijk, J, Nicou, C, Noirjean, J, Papotti, G, Pashnin, A, Pechaud, G, Pradier, J, Sanchez-Quesada, J, Shaposhnikova, E, Schokker, M, Stellfeld, D, Tuckmantel, J, Valuch, D, Wehrle, U, Weierud, F
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1378471