Production and Quality Assurance of Main Busbar Interconnection Splices during the LHC 2008-2009 Shutdown.
The main busbar interconnection splices of the Large Hadron Collider are assembled by inductive soldering of the Rutherford type cables and the copper profiles of the stabilizer. Following the September 2008 incident, the assembly process and the quality assurance have been improved, with new measur...