Cargando…
Use of the PS bumper injection septum magnets after the PS Booster upgrade at 2.0 GeV
This document evaluates if the present injection septum bumper magnets in the PS can operate with the parameters required following the upgrade of the PSB to 2 GeV.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1399557 |