Cargando…
ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION
To eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts on the main bus bar interconnections is proposed by the Task Force Splices Consolidation. To validate the design two special SSS magnet spares are placed on a test bench in SM-18 to measure the interc...
Autores principales: | , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1417516 |