Cargando…
ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION
To eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts on the main bus bar interconnections is proposed by the Task Force Splices Consolidation. To validate the design two special SSS magnet spares are placed on a test bench in SM-18 to measure the interc...
Autores principales: | , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1417516 |
_version_ | 1780924092444049408 |
---|---|
author | Willering, GP Bajko, M Bourcey, N Bottura, L Charrondiere, M Cerqueira Bastos, M Deferne, G Dib, G Giloux, Chr Grand-Clement, L Heck, S Hudson, G Kudryavtsev, D Perret, P Pozzobon, M Prin, H Scheuerlein, Chr Rijllart, A Triquet, S Verweij, AP |
author_facet | Willering, GP Bajko, M Bourcey, N Bottura, L Charrondiere, M Cerqueira Bastos, M Deferne, G Dib, G Giloux, Chr Grand-Clement, L Heck, S Hudson, G Kudryavtsev, D Perret, P Pozzobon, M Prin, H Scheuerlein, Chr Rijllart, A Triquet, S Verweij, AP |
author_sort | Willering, GP |
collection | CERN |
description | To eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts on the main bus bar interconnections is proposed by the Task Force Splices Consolidation. To validate the design two special SSS magnet spares are placed on a test bench in SM-18 to measure the interconnection in between with conditions as close as possible to the LHC conditions. Two dipole interconnections are instrumented and prepared with worst-case-conditions to study the thermo-electric stability limits. Two quadrupole interconnections are instrumented and prepared for studying the effect of current cycling on the mechanical stability of the consolidation design. All 4 shunted interconnections showed very stable behaviour, well beyond the LHC design current cycle. |
id | cern-1417516 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14175162019-09-30T06:29:59Zhttp://cds.cern.ch/record/1417516engWillering, GPBajko, MBourcey, NBottura, LCharrondiere, MCerqueira Bastos, MDeferne, GDib, GGiloux, ChrGrand-Clement, LHeck, SHudson, GKudryavtsev, DPerret, PPozzobon, MPrin, HScheuerlein, ChrRijllart, ATriquet, SVerweij, APELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATIONAccelerators and Storage RingsTo eliminate the risk of thermal runaways in LHC interconnections a consolidation by placing shunts on the main bus bar interconnections is proposed by the Task Force Splices Consolidation. To validate the design two special SSS magnet spares are placed on a test bench in SM-18 to measure the interconnection in between with conditions as close as possible to the LHC conditions. Two dipole interconnections are instrumented and prepared with worst-case-conditions to study the thermo-electric stability limits. Two quadrupole interconnections are instrumented and prepared for studying the effect of current cycling on the mechanical stability of the consolidation design. All 4 shunted interconnections showed very stable behaviour, well beyond the LHC design current cycle.CERN-ATS-Note-2012-006 TECHoai:cds.cern.ch:14175162012-01-19 |
spellingShingle | Accelerators and Storage Rings Willering, GP Bajko, M Bourcey, N Bottura, L Charrondiere, M Cerqueira Bastos, M Deferne, G Dib, G Giloux, Chr Grand-Clement, L Heck, S Hudson, G Kudryavtsev, D Perret, P Pozzobon, M Prin, H Scheuerlein, Chr Rijllart, A Triquet, S Verweij, AP ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title | ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title_full | ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title_fullStr | ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title_full_unstemmed | ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title_short | ELECTRO-THERMAL AND MECHANICAL VALIDATION EXPERIMENT ON THE LHC MAIN BUSBAR SPLICE CONSOLIDATION |
title_sort | electro-thermal and mechanical validation experiment on the lhc main busbar splice consolidation |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1417516 |
work_keys_str_mv | AT willeringgp electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT bajkom electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT bourceyn electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT bottural electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT charrondierem electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT cerqueirabastosm electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT deferneg electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT dibg electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT gilouxchr electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT grandclementl electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT hecks electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT hudsong electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT kudryavtsevd electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT perretp electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT pozzobonm electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT prinh electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT scheuerleinchr electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT rijllarta electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT triquets electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation AT verweijap electrothermalandmechanicalvalidationexperimentonthelhcmainbusbarspliceconsolidation |