Cargando…

The LHC Incident in Sector 3-4: A Simplified Mechanical Model to Explain the Mechanical Damages

On the 19th of September 2008 during powering tests of the LHC main dipole circuit in sector 3-4 an electrical fault occurred. A part of the most important resulting damages were caused by the displacements of cryostated cold masses due to the effect of an over pressurization in the insulation vacuu...

Descripción completa

Detalles Bibliográficos
Autores principales: Fessia, P, Auchmann, B, Lackner, F, Regis, F
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2012.2184516
http://cds.cern.ch/record/1425494