Cargando…
The Thames Tideway Tunnel (3/3)
<!--HTML-->Lecture 3: Insight into a pioneering project at the cutting edge of engineering: the upgrade to London’s failing sewerage system. With a growing population and heavier rainfall, the River Thames is regularly polluted in breach of European Directive requirements. Two new storage and...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1455296 |