Cargando…
Sources and solutions for LHC transfer line stability issues
The LHC is filled through two 3 km long transfer lines from the last pre-injector, the SPS. During the LHC proton run 2011 large drifts, shot-by-shot and even bunch-bybunch trajectory variations were observed with the consequence of high losses at injection and frequent lengthy trajectory correction...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1459210 |