Cargando…

Sources and solutions for LHC transfer line stability issues

The LHC is filled through two 3 km long transfer lines from the last pre-injector, the SPS. During the LHC proton run 2011 large drifts, shot-by-shot and even bunch-bybunch trajectory variations were observed with the consequence of high losses at injection and frequent lengthy trajectory correction...

Descripción completa

Detalles Bibliográficos
Autores principales: Drosdal, L, Kain, V, Bartmann, W, Bracco, C, Goddard, B, LeGodec, G, Meddahi, M, Uythoven, J
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1459210