Cargando…

High power operation with beam of a CLIC pets equipped with on/off mechanism

One of the feasibility issues of the CLIC two-beam scheme, is the possibility of rapidly switching off the rf power production in an individual Power Extraction and Transfer Structures (PETS) in case of breakdowns, either in the PETS or one of the main beam accelerating structures. The proposed solu...

Descripción completa

Detalles Bibliográficos
Autores principales: Syratchev, I, Corsini, R, Dubrovskiy, A, Skowronski, P, Ruber, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1464106