Cargando…
High power operation with beam of a CLIC pets equipped with on/off mechanism
One of the feasibility issues of the CLIC two-beam scheme, is the possibility of rapidly switching off the rf power production in an individual Power Extraction and Transfer Structures (PETS) in case of breakdowns, either in the PETS or one of the main beam accelerating structures. The proposed solu...
Autores principales: | Syratchev, I, Corsini, R, Dubrovskiy, A, Skowronski, P, Ruber, R |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1464106 |
Ejemplares similares
-
Progress towards the CLIC feasibility demonstration in CTF3
por: Skowronski, P, et al.
Publicado: (2010) -
Experimental Verifiction of the CLIC two beam Acceleration Technology in CTF3
por: Constance, B, et al.
Publicado: (2013) -
Review of the Drive Beam Stabilization in the CLIC Test Facility CTF3
por: Dubrovskiy, A, et al.
Publicado: (2013) -
Spectrometers for RF breakdown studies for CLIC
por: Jacewicz, M, et al.
Publicado: (2016) -
CLIC Main Linac Beam-Loading Compensation by Drive Beam Phase Modulation
por: Corsini, R, et al.
Publicado: (1999)