Cargando…
Readout Control Specifications for the Front-End and Back-End of the LHCb Upgrade
The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system [1] in order to run at between five and ten times the initial design luminosity. The various sub-systems in the readout architecture will need to be upgraded in order to cope with higher sub-detector occupancies, higher...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1491666 |