Cargando…
Readout Control Specifications for the Front-End and Back-End of the LHCb Upgrade
The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system [1] in order to run at between five and ten times the initial design luminosity. The various sub-systems in the readout architecture will need to be upgraded in order to cope with higher sub-detector occupancies, higher...
Autores principales: | Alessio, F, Jacobsson, R |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1491666 |
Ejemplares similares
-
Driving the LHCb front-end readout
por: Guzik, Z, et al.
Publicado: (2004) -
A generic firmware core to drive the Front-End GBT-SCAs for the LHCb upgrade
por: Alessio, F, et al.
Publicado: (2015) -
Front-end electronics control and monitoring for the LHCb Upgrade
por: Barbosa, Joao, et al.
Publicado: (2019) -
The front-end data conversion and readout electronics for the CMS ECAL upgrade
por: Mazza, Gianni
Publicado: (2017) -
Production and Testing of the LHCb Outer Tracker Front End Readout Electronics
por: Simioni, Eduard
Publicado: (2007)