Cargando…
Frequency Stability Monitoring Tool: A monitoring tool for the LHC bunch crossing signal
One of the basic responsibilities of the ATLAS Level 1 Central Trigger Processor is the distribution of timing signals, for example, the ∼ 40MHz bunch crossing signal from the accelerator, to the various parts of the detector. This is necessary in order to be able to synchronize the different signal...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1596233 |