Cargando…
Quality Assurance and Functionality Tests on Electrical Components during the ATLAS IBL Production
During the shutdown of 2013-2014, for the enhancement of the current ATLAS Pixel Detector, a fourth layer (Insertable B Layer, IBL) is being built and will be installed between the innermost layer and a new beam pipe. A new generation of readout chip has been developed, and two different sensor desi...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/9/01/C01046 http://cds.cern.ch/record/1628750 |