Cargando…

Quality Assurance and Functionality Tests on Electrical Components during the ATLAS IBL Production

During the shutdown of 2013-2014, for the enhancement of the current ATLAS Pixel Detector, a fourth layer (Insertable B Layer, IBL) is being built and will be installed between the innermost layer and a new beam pipe. A new generation of readout chip has been developed, and two different sensor desi...

Descripción completa

Detalles Bibliográficos
Autor principal: Bassalat, A
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/9/01/C01046
http://cds.cern.ch/record/1628750

Ejemplares similares