Cargando…
Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged w...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2013.2282263 http://cds.cern.ch/record/1662556 |