Cargando…

Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation

Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged w...

Descripción completa

Detalles Bibliográficos
Autores principales: Newborough, A, Buzio, M, Chritin, R
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2013.2282263
http://cds.cern.ch/record/1662556