Cargando…

Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation

Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged w...

Descripción completa

Detalles Bibliográficos
Autores principales: Newborough, A, Buzio, M, Chritin, R
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2013.2282263
http://cds.cern.ch/record/1662556
_version_ 1780935183583674368
author Newborough, A
Buzio, M
Chritin, R
author_facet Newborough, A
Buzio, M
Chritin, R
author_sort Newborough, A
collection CERN
description Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged with small differences (<1%) between the inner and outer gaps of the main bending magnet fields being compensated by trim power supplies. The future upgrade of the machine will demand to extract protons at an energy of 2.0 GeV and require almost double the original dipole field. At this field, due to saturation effects, the inner and outer gaps of the main dipole magnets will differ by up to 4%. This paper presents the design and implementation of a modification of the magnetic circuit strongly reducing these effects. We also discuss the results of experimental tests concerning the effects on field quality and eddy current transients, including the implications for the real-time magnetic field measurement system to control RF and power supplies.
id cern-1662556
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-16625562019-09-30T06:29:59Zdoi:10.1109/TASC.2013.2282263http://cds.cern.ch/record/1662556engNewborough, ABuzio, MChritin, RUpgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV OperationAccelerators and Storage RingsSince its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged with small differences (<1%) between the inner and outer gaps of the main bending magnet fields being compensated by trim power supplies. The future upgrade of the machine will demand to extract protons at an energy of 2.0 GeV and require almost double the original dipole field. At this field, due to saturation effects, the inner and outer gaps of the main dipole magnets will differ by up to 4%. This paper presents the design and implementation of a modification of the magnetic circuit strongly reducing these effects. We also discuss the results of experimental tests concerning the effects on field quality and eddy current transients, including the implications for the real-time magnetic field measurement system to control RF and power supplies.CERN-ACC-2014-0025oai:cds.cern.ch:16625562014-02-19
spellingShingle Accelerators and Storage Rings
Newborough, A
Buzio, M
Chritin, R
Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title_full Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title_fullStr Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title_full_unstemmed Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title_short Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
title_sort upgrade of the cern proton synchrotron booster bending magnets for 2 gev operation
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2013.2282263
http://cds.cern.ch/record/1662556
work_keys_str_mv AT newborougha upgradeofthecernprotonsynchrotronboosterbendingmagnetsfor2gevoperation
AT buziom upgradeofthecernprotonsynchrotronboosterbendingmagnetsfor2gevoperation
AT chritinr upgradeofthecernprotonsynchrotronboosterbendingmagnetsfor2gevoperation