Cargando…
Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation
Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged w...
Autores principales: | Newborough, A, Buzio, M, Chritin, R |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2013.2282263 http://cds.cern.ch/record/1662556 |
Ejemplares similares
-
The Upgrade of the CERN Proton Synchrotron Booster Transfer Line Magnets
por: Newborough, Antony
Publicado: (2020) -
Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN
por: Sarrio Martinez, A, et al.
Publicado: (2012) -
Operation of the CERN PS-booster above 1 GeV: saturation effects in the main bending magnets and required modifications
por: Benedikt, M, et al.
Publicado: (1998) -
Operation of the CERN PS-Booster above 1 GeV: saturation effects in the main bending magnets and required modifications
por: Benedikt, Michael, et al.
Publicado: (1998) -
Technical specification: Specification for pulsed bending magnets (bumpers) for the CERN 28 GEV proton synchrotron
por: Bossard, P
Publicado: (1968)