Cargando…

Assembly, Loading, and Cool‐down of the FRESCA2 Support Structure

This paper reports on the assembly process and cool-down to cryogenic temperature of the support structure of FRESCA2, which is a dipole magnet for upgrading the actual CERN cable test facility FRESCA. The structure of the FRESCA2 magnet is designed to provide the adequate pre-stress, through the us...

Descripción completa

Detalles Bibliográficos
Autores principales: Muñoz Garcia, J E, Giloux, C, Ziemianski, D T, Rondeaux, F, de Rijk, G, Bajas, H, Rifflet, J M, Perez, J C, Durante, M, Charrondiere, M, Bajko, M, Devaux, M, Guinchard, M, Ferracin, P, Fessia, P, Manil, P
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2013.2284421
http://cds.cern.ch/record/1662584