Cargando…
M10.3.1: LHC crab cavity specifications completed
• The starting point of Sub-task 1 is to determine the full LHC system requirements for the crab cavity system. This milestone concerns completion of basic specifications for the crab cavity system. This comprises the beam requirements, the cavity impedance constraints, the operating conditions and...
Autor principal: | |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710444 |