Cargando…
Phase 1 pixel modules production and High Density Interconnect testing
During the first run of the LHC, luminosity peaked at $1 \times 10^{34} cm^{-2}s^{-1}$ with $ \approx 50 ns$ bunch spacing a pile-up of about 25, or simultaneous inelastic collisions per crossing, occur in the CMS experiment. However after the upgrade of of the LHC during long shut down 1, luminosit...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1752516 |