Cargando…

Phase 1 pixel modules production and High Density Interconnect testing

During the first run of the LHC, luminosity peaked at $1 \times 10^{34} cm^{-2}s^{-1}$ with $ \approx 50 ns$ bunch spacing a pile-up of about 25, or simultaneous inelastic collisions per crossing, occur in the CMS experiment. However after the upgrade of of the LHC during long shut down 1, luminosit...

Descripción completa

Detalles Bibliográficos
Autor principal: Still, Joseph
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1752516
_version_ 1780943182811365376
author Still, Joseph
author_facet Still, Joseph
author_sort Still, Joseph
collection CERN
description During the first run of the LHC, luminosity peaked at $1 \times 10^{34} cm^{-2}s^{-1}$ with $ \approx 50 ns$ bunch spacing a pile-up of about 25, or simultaneous inelastic collisions per crossing, occur in the CMS experiment. However after the upgrade of of the LHC during long shut down 1, luminosity, and therefore pile-up. Therefore the CMS pixel tracker has to be upgraded to be able to operate correctly under this news stronger constraints. That is how this CERN Summer Student project, which took place at the CERN Meyrin site, comes within the framework of the pixel detector upgrade in the CMS experiment with a work aimed on the phase 1 of pixel modules production and tests of the HDI. The production and tests of the HDI were held in cleanroom facilities. This included first hand as well as to work on pixel modules building and performing size and flatness tests on them, and on a other hand testing several HDIs. At first, prototypes modules were assembled before real modules building. Another aspect of work was to test the flatness of 24 German handles used to hold the pixel module on top of them. These tests were held outside the cleanroom, with a cold box setup. In the end one real module was built and tested during this project.
id cern-1752516
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-17525162019-09-30T06:29:59Zhttp://cds.cern.ch/record/1752516engStill, JosephPhase 1 pixel modules production and High Density Interconnect testingDetectors and Experimental TechniquesDuring the first run of the LHC, luminosity peaked at $1 \times 10^{34} cm^{-2}s^{-1}$ with $ \approx 50 ns$ bunch spacing a pile-up of about 25, or simultaneous inelastic collisions per crossing, occur in the CMS experiment. However after the upgrade of of the LHC during long shut down 1, luminosity, and therefore pile-up. Therefore the CMS pixel tracker has to be upgraded to be able to operate correctly under this news stronger constraints. That is how this CERN Summer Student project, which took place at the CERN Meyrin site, comes within the framework of the pixel detector upgrade in the CMS experiment with a work aimed on the phase 1 of pixel modules production and tests of the HDI. The production and tests of the HDI were held in cleanroom facilities. This included first hand as well as to work on pixel modules building and performing size and flatness tests on them, and on a other hand testing several HDIs. At first, prototypes modules were assembled before real modules building. Another aspect of work was to test the flatness of 24 German handles used to hold the pixel module on top of them. These tests were held outside the cleanroom, with a cold box setup. In the end one real module was built and tested during this project.CERN-STUDENTS-Note-2014-139oai:cds.cern.ch:17525162014-08-29
spellingShingle Detectors and Experimental Techniques
Still, Joseph
Phase 1 pixel modules production and High Density Interconnect testing
title Phase 1 pixel modules production and High Density Interconnect testing
title_full Phase 1 pixel modules production and High Density Interconnect testing
title_fullStr Phase 1 pixel modules production and High Density Interconnect testing
title_full_unstemmed Phase 1 pixel modules production and High Density Interconnect testing
title_short Phase 1 pixel modules production and High Density Interconnect testing
title_sort phase 1 pixel modules production and high density interconnect testing
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/1752516
work_keys_str_mv AT stilljoseph phase1pixelmodulesproductionandhighdensityinterconnecttesting