Cargando…
Phase 1 pixel modules production and High Density Interconnect testing
During the first run of the LHC, luminosity peaked at $1 \times 10^{34} cm^{-2}s^{-1}$ with $ \approx 50 ns$ bunch spacing a pile-up of about 25, or simultaneous inelastic collisions per crossing, occur in the CMS experiment. However after the upgrade of of the LHC during long shut down 1, luminosit...
Autor principal: | Still, Joseph |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1752516 |
Ejemplares similares
-
High Density Interconnect for the CMS Phase 1 Pixel Upgrade: Electrical Test and Visual Inspection
por: Phillips, Catherine Louise
Publicado: (2015) -
Pixel module production and qualification for the Phase 1 Upgrade of CMS
por: Minano Moya, Mercedes
Publicado: (2014) -
Production accompanying testing of the ATLAS Pixel module
por: Dobos, Daniel Adam
Publicado: (2004) -
Flip-chip interconnection of 100 k pixel hybrid detectors
por: Humpston, G
Publicado: (1998) -
System Tests and Qualification of Pixel Modules and DC-DC Converters for the Phase-1 Upgrade of the CMS Pixel Detector
por: Lipinski, Martin
Publicado: (2019)