Cargando…
Estimation of potential radiation damage to electronics units in the CLIC tunnel
An electronic unit is required for each CLIC “Two Beam Module”. This study aims to estimate the potential damage due to the prompt radiation to the electronics units installed inside the CLIC Main Linac tunnel. Sets of Monte-Carlo simulations have been done to estimate damage to electronics installe...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1950518 |