Cargando…
Transfer lines - stability and optimization
During the LHC proton run 2011 large drifts, shot-by- shot and even bunch-by-bunch trajectory variations were observed with the consequence of high losses at injection and frequent lengthy trajectory correction campaigns. The different effects will be quantified and an estimate for downtime caused b...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1975480 |