Cargando…
The ATLAS Trigger Core Configuration and Execution System in Light of the ATLAS Upgrade for LHC Run 2
During the 2013/14 shutdown of the Large Hadron Collider (LHC) the ATLAS first level trigger (L1) and the data acquisition system (DAQ) were substantially upgraded to cope with the increase in luminosity and collision multiplicity, expected to be delivered by the LHC in 2015. Upgrades were performed...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/664/8/082017 http://cds.cern.ch/record/2016643 |