Cargando…

Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

Abstract. During the LHC Long Shutdown 1 period (LS1), that started in 2013, the Simulation at Point1 (Sim@P1) Project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute...

Descripción completa

Detalles Bibliográficos
Autores principales: Brasolin, Franco, Fressard-Batraneanu, Silvia Maria, Ballestrero, Sergio, Contescu, Alexandru Cristian, Fazio, Daniel, Di Girolamo, Alessandro, Lee, Christopher Jon, Pozo Astigarraga, Mikel Eukeni, Scannicchio, Diana, Sedov, Alexey, Twomey, Matthew Shaun, Wang, Fuquan, Zaytsev, Alexander
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1742-6596/664/2/022008
http://cds.cern.ch/record/2016645