Cargando…

Overview and Present Status of the CMS Phase 1 Pixel Upgrade

During the Run 2 of the LHC a significant luminosity increase to 2x$10^{34}$ cm$^{-2}$s$^{-1}$ is foreseen. As the innermost tracking device of CMS, the silicon pixel detector has to cope with large particle fluxes and radiation damage. To maintain the present high tracking efficiency, the current p...

Descripción completa

Detalles Bibliográficos
Autor principal: Lipinski, Martin
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2015.11.067
http://cds.cern.ch/record/2027713