Cargando…
Extraction and beam transfer for the SHiP facility
This document summarises the key feasibility issues associated with the SPS extraction and beam transfer systems required for the SHiP facility. It describes the expected performance limits of the electrostatic septa, the expected beam losses during extraction and consequences, the design of the new...
Autores principales: | , , , , , , , , , , , , , |
---|---|
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2063299 |