Cargando…
Extraction and beam transfer for the SHiP facility
This document summarises the key feasibility issues associated with the SPS extraction and beam transfer systems required for the SHiP facility. It describes the expected performance limits of the electrostatic septa, the expected beam losses during extraction and consequences, the design of the new...
Autores principales: | Goddard, Brennan, Fraser, Matthew Alexander, Borburgh, Jan, Balhan, Bruno, Le Godec, Gilles, Zerlauth, Markus, Tommasini, Davide, Kain, Verena, Cornelis, Karel, Wenninger, Jorg, Jensen, Lars, Todd, Benjamin, Bauche, Jeremie, Puccio, Bruno |
---|---|
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2063299 |
Ejemplares similares
-
The SPS beam parameters, the operational cycle, and proton sharing with the SHiP facility
por: Arduini, Gianluigi, et al.
Publicado: (2015) -
SPS Operation and Future Proton Sharing scenarios for the SHiP experiment at the BDF facility
por: Bartosik, Hannes, et al.
Publicado: (2018) -
The SHiP facility at CERN
por: De Lellis, Giovanni
Publicado: (2016) -
The SHiP facility at the SPS
por: GATIGNON, Lau
Publicado: (2015) -
Civil Engineering for the SHiP facility
por: Osborne, John Andrew, et al.
Publicado: (2015)