Cargando…
Assembly of the first model of MQXFS quadrupole magnet for Hi-Lumi
Building 927. Assembly of the first model of MQXFS quadrupole magnet for Hi-Lumi. The MQXF models are about 1.5 m long and are used to validate the design before start building the first long prototype. Two types of insertion quadrupoles will be built and installed in the LHC tunnel during LS3. LARP...
Autor principal: | |
---|---|
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2202390 |