Cargando…
Phase 1 Front-End CMS Calorimeter (HE) Upgrade Preparation
Preparation of HE Phase 1 Front-End upgrade is shown. For the final quality control of the new generation HE front-end electronics components a Burn-in stand has been prepared. All electronics components are being tested on the burn-in stand and should pass through the burn-in QC before the installa...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2227192 |