Cargando…

Phase 1 Front-End CMS Calorimeter (HE) Upgrade Preparation

Preparation of HE Phase 1 Front-End upgrade is shown. For the final quality control of the new generation HE front-end electronics components a Burn-in stand has been prepared. All electronics components are being tested on the burn-in stand and should pass through the burn-in QC before the installa...

Descripción completa

Detalles Bibliográficos
Autor principal: Bunin, Pavel
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2227192

Ejemplares similares