Cargando…

Data acquisition and online control system for new gas-electron multiplier detectors in the endcap muon system of the CMS experiment

A new data acquisition and on-line control system is being developed for gas-electron multiplier (GEM) detectors which will be installed in the forward region (1.6 \( < \eta < \) 2.2) of the CMS muon spectrometer during the 2nd long shutdown of the LHC, planned for the period 2018-2019. A pro...

Descripción completa

Detalles Bibliográficos
Autor principal: Ruiz Alvarez, Jose David
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.282.0247
http://cds.cern.ch/record/2231900