Cargando…
Data acquisition and online control system for new gas-electron multiplier detectors in the endcap muon system of the CMS experiment
A new data acquisition and on-line control system is being developed for gas-electron multiplier (GEM) detectors which will be installed in the forward region (1.6 \( < \eta < \) 2.2) of the CMS muon spectrometer during the 2nd long shutdown of the LHC, planned for the period 2018-2019. A pro...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.282.0247 http://cds.cern.ch/record/2231900 |