Cargando…
Phase 1 upgrade of the CMS Drift Tubes Read-Out system
In order to cope with up to a factor 2 nominal LHC luminosity, the second level of the readout system of the CMS Drift Tubes (DT) electronics needs to be redesigned to minimize event processing time and remove present bottlenecks. The uROS boards are uTCA modules, which include a Xilinx Virtex-7 FPG...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/12/03/C03070 http://cds.cern.ch/record/2233178 |