Cargando…

Installation of the Gbar LINAC

Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

Detalles Bibliográficos
Autor principal: Maximilien, Brice
Publicado: 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2253837