Cargando…
Installation of the Gbar LINAC
Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.
Autor principal: | |
---|---|
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2253837 |