Cargando…

Requirements and constraints of EIR design option on WP2, WP4, WP5: Milestone M3.3

In this document we will review the design task of the WP3 (EIR), namely EIR optics (task 1), Machine Detector Interface (task 2), and Beam-Beam effects (task 3) and map the related challenges into the constraints and requirements for the other work packages – arc design (WP2), cryogenic beam vacuum...

Descripción completa

Detalles Bibliográficos
Autor principal: Seryi, Andrei
Publicado: 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2261545