Cargando…
YETS2018 - CRAB cavity installation in the SPS tunnel
Preparation of installation of test facility for the Crab Cavity for the High Luminosity LHC in the SPS tunnel (BA6).
Autor principal: | |
---|---|
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2298952 |