Cargando…

YETS2018 - CRAB cavity installation in the SPS tunnel

Preparation of installation of test facility for the Crab Cavity for the High Luminosity LHC in the SPS tunnel (BA6).

Detalles Bibliográficos
Autor principal: Brice, Maximilien
Publicado: 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2298952