Cargando…
YETS2018 - CRAB cavity installation in the SPS tunnel
Preparation of installation of test facility for the Crab Cavity for the High Luminosity LHC in the SPS tunnel (BA6).
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2298952 |
Ejemplares similares
-
YETS2018 - CRAB table installation in the SPS tunnel
por: Brice, Maximilien, et al.
Publicado: (2018) -
Crab Cavity test stand in SPS tunnel during YETS2018
por: Brice, Maximilien, et al.
Publicado: (2018) -
Crab cavity test in the SPS tunnel
por: Brice, Maximilien
Publicado: (2018) -
CERN CRAB Cavitiy installation in the SPS tunnel
por: Brice, Maximilien, et al.
Publicado: (2018) -
Coldbox installation for HL-LHC crab cavity test in the SPS tunnel (BA6)
por: Ordan, Julien Marius, et al.
Publicado: (2018)