Cargando…
LLRF beam results on the first year of ELENA’s commissioning with beam
CERN’s Extra Low ENergy Antiproton (ELENA) ring’s commissioning with beam started in earnest in March 2017. Ions from an H- source were injected in ELENA at low energy, although in a degraded way (lower voltage and intensity than planned) and with not constant reproducibility of the injection. From...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2306175 |