Cargando…
LLRF beam results on the first year of ELENA’s commissioning with beam
CERN’s Extra Low ENergy Antiproton (ELENA) ring’s commissioning with beam started in earnest in March 2017. Ions from an H- source were injected in ELENA at low energy, although in a degraded way (lower voltage and intensity than planned) and with not constant reproducibility of the injection. From...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2306175 |
Sumario: | CERN’s Extra Low ENergy Antiproton (ELENA) ring’s commissioning with beam started in earnest in March 2017. Ions from an H- source were injected in ELENA at low energy, although in a degraded way (lower voltage and intensity than planned) and with not constant reproducibility of the injection. From August 2017 onwards antiprotons from the AD were also injected in ELENA at high energy for up to three, weekly MD session. The 2017 ELENA commissioning run stopped on December 1st to allow the installation of the electron cooler. This note gives an overview of the successful operation carried out by the ELENA Low-Level RF (LLRF) during the first year of ELENA commissioning and of the main beam results obtained. Operation with H- ions and with antiprotons are considered, together with different operational settings and problems encountered. Hints on future deployment and commissioning steps are also provided. |
---|