Cargando…
BDF target prototype assembly
Assembly of the target prototype before installation in TCC2. Instrumentation (temperature and strain rate sensors) of the target blocks, installation of the blocks and assembly of the inner and outer tank. Procedure carried out in the EN/STI Workshop (Bdg. 867). The target blocks are installed in a...
Autor principal: | |
---|---|
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2635418 |