Cargando…

BDF target prototype assembly

Assembly of the target prototype before installation in TCC2. Instrumentation (temperature and strain rate sensors) of the target blocks, installation of the blocks and assembly of the inner and outer tank. Procedure carried out in the EN/STI Workshop (Bdg. 867). The target blocks are installed in a...

Descripción completa

Detalles Bibliográficos
Autor principal: Ordan, Julien Marius
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2635418