Cargando…
BDF target prototype assembly
Assembly of the target prototype before installation in TCC2. Instrumentation (temperature and strain rate sensors) of the target blocks, installation of the blocks and assembly of the inner and outer tank. Procedure carried out in the EN/STI Workshop (Bdg. 867). The target blocks are installed in a...
Autor principal: | Ordan, Julien Marius |
---|---|
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2635418 |
Ejemplares similares
-
BDF target prototype installation in TCC2
por: Ordan, Julien Marius
Publicado: (2018) -
PANDA Muon System prototype at Compass
por: Ordan, Julien Marius
Publicado: (2020) -
GEMPIX Prototype Studio Session 2017
por: Brice, Maximilien, et al.
Publicado: (2017) -
CLIC prototype on which the electron FLASH radiotherapy design is based
por: Ordan, Julien Marius
Publicado: (2022) -
Sensor prototype
por: Ordan, Julien
Publicado: (2016)